Repository logo
 

Comparing claims and disputes performance between traditional project delivery method and alternate project delivery methods

dc.contributor.authorBashettiyavar, Gautham, author
dc.contributor.authorMehany, Mohammed S. Hashem M., advisor
dc.contributor.authorSenior, Bolivar, advisor
dc.contributor.authorSwitzer, Ralph V., committee member
dc.date.accessioned2018-06-12T16:14:08Z
dc.date.available2018-06-12T16:14:08Z
dc.date.issued2018
dc.description.abstractClaims and disputes are common in construction projects and the costs associated with these adversarial relationships can reach up to $4-12 billion per year. While previous studies have indicated that project delivery methods (PDMs) might impact the frequency and severity of claims and disputes on construction projects, none provided any empirical evidence to support this perception, especially as related to the claim types in different project delivery methods. To address this issue and explore the different variables that might affect claims and disputes among many other project performances metrics, this empirical study was initiated. Data was collected by distributing a questionnaire to Departments of Transportation (DOTs) across the transportation sector. The data was analyzed using descriptive and inferential statistics. Results showed that while PDMs, procurement, and contractual methods have no significant impact on the claims and disputes performance, PDMs can impact other factors (e.g. contractor's performance and trust). These significant findings provide opportunities for further research in other areas such as trust and partnering, which were proven to strategically act as indirect mitigation practices to claims and disputes occurrence in construction projects. The research can also be used by practitioners to further understand the real reasons behind claims and disputes, avoid their triggers, and build a good model of trust for claims and disputes avoidance.
dc.format.mediumborn digital
dc.format.mediummasters theses
dc.identifierBashettiyavar_colostate_0053N_14743.pdf
dc.identifier.urihttps://hdl.handle.net/10217/189362
dc.languageEnglish
dc.language.isoeng
dc.publisherColorado State University. Libraries
dc.relation.ispartof2000-2019
dc.rightsCopyright and other restrictions may apply. User is responsible for compliance with all applicable laws. For information about copyright law, please see https://libguides.colostate.edu/copyright.
dc.subjectclaims and dispute
dc.subjectdesign bid build
dc.subjectproject delivery methods
dc.subjectCM/GC
dc.subjectalternate project delivery methods
dc.subjectdesign build
dc.titleComparing claims and disputes performance between traditional project delivery method and alternate project delivery methods
dc.typeText
dcterms.rights.dplaThis Item is protected by copyright and/or related rights (https://rightsstatements.org/vocab/InC/1.0/). You are free to use this Item in any way that is permitted by the copyright and related rights legislation that applies to your use. For other uses you need to obtain permission from the rights-holder(s).
thesis.degree.disciplineConstruction Management
thesis.degree.grantorColorado State University
thesis.degree.levelMasters
thesis.degree.nameMaster of Science (M.S.)

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Bashettiyavar_colostate_0053N_14743.pdf
Size:
701.3 KB
Format:
Adobe Portable Document Format