Sedimentation study of the Yazoo River Basin. Greenwood Bendway Study
Date
1979-08
Authors
Simons, D. B., author
Li, R. M., author
Brown, G. O., author
Civil Engineering Department, Engineering Research Center, Colorado State University, publisher
Journal Title
Journal ISSN
Volume Title
Abstract
The primary purpose of the Phase I study was to evaluate the overall river basin response in both the main stem and its major tributaries associated with the Upper Yazoo Project. In accordance with the letter dated March 30, 1978, from the U.S. Army Corps of Engineers, Colorado State University was requested to conduct an additional study on the Greenwood Bendway. The purpose of this additional study is to study flood control and sedimentation problems associated with the Greenwood Bendway in the Yazoo River Basin, Mississippi.
Description
CER79-80DBS-RML-GOB9.
Prepared for U.S. Army Corps of Engineers, Vicksburg District, Vicksburg, Mississippi.
August 1979.
Includes bibliographical reference.
Prepared for U.S. Army Corps of Engineers, Vicksburg District, Vicksburg, Mississippi.
August 1979.
Includes bibliographical reference.
Rights Access
Subject
Sedimentation and deposition -- Mississippi -- Yazoo River